Temporary Facility Shutdown: A Case Study
Case Studies
How Azenta Life Sciences Supported a Facility Upgrade at a Leading Medical Research Institute
The Azenta Life Sciences lab transport division was hired to supply and maintain power to all critical equipment while documenting temperatures every two hours for a large medical research center.
Learn how our team supported this project, download the case study today!
Download Case Study
Submit this form to access the case study!